El Estero
El Estero WWTP: Abrasive blasting and coating performed on the existing aeration basins approximately 36,508 sq ft. of concrete with 100% solids epoxy. Abrasive blasting and application of vinyl ester epoxy with fiberglass to 2,123 sq ft. of concrete containment. Painting of all the new mechanical on the project. Application of traffic coating to the concrete deck of the aeration basin 16,130 sq ft. General Contractor was Stanek Constructors.